A 30-year walkway needing work, but at a low cost. The requirements: meet level with porch pad and driveway. match brick coloring. be 36 inches wide. keep cost under 1,000$ . move to center between posts.



Time: Labor 20 hours materials, sand, paver gravel, weed screen, brick and 16 x 16 blocks.
Cutting brick and block using a masonry blade on the grinder. Chisel and hammer. USed 4 ft, 2 ft, 1 ft levels string, and 2 lb hammer. 4 Wheelbarrows of dirt had to be moved to back garden.